§ 01Index Same-day fault diagnostics

Licensed master electricians · Karachi Power that holds — even when the grid does not.

From a flickering kitchen circuit to a full panel swap on an occupied 1980s build, we wire it the way the inspector would do it himself.

Family-run since 2011. We pull permits, label every breaker, and leave a wiring diagram taped inside the panel door. No surprise add-ons, no apprentices learning on your house.

  • 24·7Emergency response
Plumber on a precision callout
ON CALL · 24·7 · ON CALL · 24·7 · ON CALL · 24·7 ·
Workshop bench with calibrated tools
§ 02Manifesto

A panel done once, by people who care twice.

Voltline started in Tariq Mehmood's garage in 2011 — one van, one master license, one hard rule: every job leaves the house safer than we found it. Today his son Asad runs the bench, his daughter Sana runs dispatch, and seven trucks roll out at 6:30am.

We do not chase volume. We do roughly 380 jobs a year, mostly repeat clients and word-of-mouth. The names painted on the truck still answer the phone after dark.

  1. 1.01
    Diagnose before opening. Acoustic gear, thermal imaging, sewer cameras — we find the fault before the first cut.
  2. 1.02
    Material honesty. Type-L copper, lead-free brass, PEX-A. No mystery alloys, no on-the-cheap fittings.
  3. 1.03
    Finish like a cabinetmaker. Walls patched flush, tile reset to grout-line, drywall blended to original sheen.
  4. 1.04
    Documentation. Photo-logged work and line drawings filed for the home's archive.
§ 03Service ledger

Every wire, labelled. Every panel, signed off.

Each entry below is a discipline we work in every week. Pricing is itemised on the visit ticket — never tucked into a finishing bill.

  1. 01

    Panel upgrade & service-entrance replacement

    Code-compliant · KE-coordinated

    Old fuse box or under-rated 60A panel? We size for your real load (induction stove, solar, EV), pull the KE permit, and finish with neat labelling and a wiring diagram in the door.

    PKR 85,000 from Panel upgrade & service-entrance replacement
  2. 01

    EV charger install (Type 2 / wallbox)

    Wallbox · 7kW–22kW

    Dedicated 32A or 40A circuit, RCBO-protected, weatherproof outdoor or covered indoor. We coordinate with your charger brand (Tesla, Ather, Schneider) and load-balance against your existing panel.

    PKR 42,000 installed EV charger install (Type 2 / wallbox)
  3. 01

    Whole-house rewire

    Cloth · Aluminum · Knob-and-tube

    From single-bath refresh to full-house copper rewire on an occupied 1965 build. Dust contained, walls patched, every circuit tested before drywall closes.

    PKR 220,000 from Whole-house rewire
  4. 01

    Generator & ATS install

    Standby · Portable · UPS-coupled

    Sized for your real critical-load list — not a sales-rep guess. Automatic transfer switch, fuel run, exhaust clearance, annual service contract optional.

    PKR 65,000 from Generator & ATS install
  5. 01

    Lighting design & install

    Recessed · Track · Smart

    From a kitchen recessed plan to whole-house smart lighting (Lutron / Hue). Layered design — task, ambient, accent — not just sticking cans in the ceiling.

    PKR 1,800 per fixture Lighting design & install
  6. 01

    Fault diagnosis & repair

    Tripping · Burning smell · Flicker

    Thermal-imaging panel scan, megger insulation test, full circuit trace. We find it before we tear anything open — most calls solved on the first visit.

    PKR 3,500 dispatch Fault diagnosis & repair
§ 04Voices

A thousand panels later — and still picking up the phone.

The kind of trade you call once and then never have to call again. Diagnostics like a forensic team, finish like a cabinetmaker.

Project owner · Hillcrest residence

Two contractors quoted me a full rewire. Voltline ran a megger test, found one bad junction box behind the kitchen, fixed it in two hours for PKR 6,800. Honest people.

Saira Khan DHA Phase 8 · Homeowner

They are the only sparkies in Karachi I let near my clients' panels. Drawings before they start, photos after they finish, every breaker labelled. Old-school discipline.

Ahmed Faruqi Clifton · Architect

Wallbox quoted in the morning, installed by 4pm the next day. Load-balanced against my AC compressor without a second visit. Charging at 32A first night.

Rohan Mehta Bahadurabad · Tesla Model 3 owner
§ 05Open a ticket

Tell us what is tripping — we will trace it.

A plumber will reach out to confirm the details and schedule your visit.

TICKET / CTL · 2026 · NEW